Local Updates1 min read
Bellandur Lake's rejuvenation faces a six-month delay as 70 acres of the lakebed near the eastern boundary still require desilting. Sign today at https://www.kybia.org
9/10/2026, 11:00:42 am · Bengaluru · Local Updates
By @x_kybiaorg

Bellandur Lake's rejuvenation faces a six-month delay as 70 acres of the lakebed near the eastern boundary still require desilting. #BellandurLake #Bengaluru #Kybia Sign today at kybia.org/petition 📝 to prevent further delay of desilting in Bellandur lake.
Source: https://x.com/KYBIAOrg/status/2108504152930451776
