Local Updates1 min read
RT by @1234uday: In different parts of the roads have been painted like this. Being a civil engineer by profession I was just searching for the cost incurred for this make over. As per CPWD D
12/10/2026, 7:01:58 am · Kolkata · Local Updates
By @x_sumonseng
In different parts of #Kolkata the roads have been painted like this. Being a civil engineer by profession I was just searching for the cost incurred for this make over. As per CPWD DSR it comes to ₹ 45,20000 for 1 km with 60 ft width. PS : Huge parts of roads r still damaged. Video
Source: https://x.com/sumonseng/status/2109533449413665147
