Local UpdatesMumbai1 min read
successfully concludes its annual post-monsoon runway maintenance. In a calibrated six-hour operation, both RWY 09/27 and RWY 14/32 were thoroughly inspected and restored to optimal con
Added to Nesh: · Mumbai · Local Updates
Source: X (@CSMIA_Official)
Shared on NeshSource: X (@CSMIA_Official)
Read original#MumbaiAirport successfully concludes its annual post-monsoon runway maintenance. In a calibrated six-hour operation, both RWY 09/27 and RWY 14/32 were thoroughly inspected and restored to optimal condition, reinforcing airside safety standards and operational efficiency at #MumbaiAirport . The comprehensive maintenance covered detailed inspection and repair of runway surfaces, rubber removal, runway intersection painting, maintenance and safety checks of Airfield Ground Lighting systems, validation of Runway End Safety Areas, and testing of over 5,000 aeronautical ground lights and other essential systems. Planned in coordination with airlines and stakeholders six months in advance, the exercise helps ensure infrastructure resilience, passenger safety and continued operational readiness at one of the world’s busiest single-runway airports. #CSMIA #RunwayMaintenance #AirportOperations #AviationSafety Video
This report has not been independently verified by Nesh.
