Local UpdatesMumbai1 min read
Mumbai Metro 7A construction resumes, Airports Authority of India clearance awaited
Added to Nesh: · Mumbai · Local Updates
Source: Hindustan Times on MSN
Shared on NeshSource: Hindustan Times on MSN
Read originalMumbai Metro Line 7A construction has resumed despite a 2.5-metre height breach near the airport, with the MMRDA awaiting final clearance from AAI.
This report has not been independently verified by Nesh.
