
Local UpdatesKolkata1 min read
RT by @metrorailwaykol: Powering Bharat’s ambition. Enabling a new era of mobility! A network of 14 Traction Substations is being developed along the 508 km Mumbai–Ahmedabad Bullet Train corridor, for
Added to Nesh: · Kolkata · Local Updates
Source: X (@RailMinIndia)
Shared on NeshSource: X (@RailMinIndia)
Read originalPowering Bharat’s ambition. Enabling a new era of mobility! A network of 14 Traction Substations is being developed along the 508 km Mumbai–Ahmedabad Bullet Train corridor, forming the backbone of its advanced traction power supply system. #BulletTrain
This report has not been independently verified by Nesh.
