Local UpdatesKolkata1 min read
RT by @1234uday: In different parts of the roads have been painted like this. Being a civil engineer by profession I was just searching for the cost incurred for this make over. As per CPWD D
Added to Nesh: · Kolkata · Local Updates
Source: X (@sumonseng)
Shared on NeshSource: X (@sumonseng)
Read originalIn different parts of #Kolkata the roads have been painted like this. Being a civil engineer by profession I was just searching for the cost incurred for this make over. As per CPWD DSR it comes to ₹ 45,20000 for 1 km with 60 ft width. PS : Huge parts of roads r still damaged. Video
This report has not been independently verified by Nesh.
