Local UpdatesChennai1 min read
PM Modi opens Chennai Metro Phase 2's first stretch today: 15 km Poonamallee-Vadapalani, ~Rs 4,900 cr, a 3.7 km double-decker section and signalling built for driverless ops (PIB). Public service from
Added to Nesh: · Chennai · Local Updates
Source: X (@NaveenKumar__T)
Shared on NeshSource: X (@NaveenKumar__T)
Read originalPM Modi opens Chennai Metro Phase 2's first stretch today: 15 km Poonamallee-Vadapalani, ~Rs 4,900 cr, a 3.7 km double-decker section and signalling built for driverless ops (PIB). Public service from 4 PM. Western Chennai commuters finally get relief. #Chennai #TamilNadu #Metro
This report has not been independently verified by Nesh.
