Local UpdatesChennai1 min read
How Chennai’s first operational Phase-2 Metro stretch will work: From the 11 stations on the 15km Poonamallee-Vadapalani corridor to peak-hour services every 10 minutes, here ...
Added to Nesh: · Chennai · Local Updates
Source: The Times of India
Shared on NeshSource: The Times of India
Read originalThe first operational stretch of Chennai Metro Rail Phase-2 connects Poonamallee Bypass and Vadapalani. The 15km elevated corridor, part of Corridor-4, has 11 stations and was built at a cost of Rs 4, ...
This report has not been independently verified by Nesh.
