
Local UpdatesBengaluru1 min read
RT by @vmprakash9: ■#Bengaluru Connectivity Fast forward 🙌■ Save the Maps 👇 ● Namma ● Suburban Rail ( AC coach) ● PRR/BBC Phase 1 &2 ● STRR - 280 KM
Added to Nesh: · Bengaluru · Local Updates
Source: X (@priyaJasTweet4u)
Shared on NeshSource: X (@priyaJasTweet4u)
Read original■ #Bengaluru Connectivity Fast forward 🙌■ Save the Maps 👇 ● Namma #Metro ● Suburban Rail ( AC coach) ● PRR/BBC Phase 1 &2 ● STRR - 280 KM
This report has not been independently verified by Nesh.
