![🚇 Metro Phase 3 double-decker plans [redacted]nk from 37 km to ~10 km. 📍 Orange Line: → Sarakki Junction: 1.3 km → Kamakya–Ittamadu: 1.5 km → Kadabagere: 4 km 🛰️ Check your plot near the route before](/_next/image?url=https%3A%2F%2Fpbs.twimg.com%2Fmedia%2FHULzF05b0AA7YcU.jpg&w=3840&q=75)
Local UpdatesBengaluru1 min read
🚇 Metro Phase 3 double-decker plans [redacted]nk from 37 km to ~10 km. 📍 Orange Line: → Sarakki Junction: 1.3 km → Kamakya–Ittamadu: 1.5 km → Kadabagere: 4 km 🛰️ Check your plot near the route before
Added to Nesh: · Bengaluru · Local Updates
Source: X (@TalkingLands)
Shared on NeshSource: X (@TalkingLands)
Read original🚇 Metro Phase 3 double-decker plans [redacted]nk from 37 km to ~10 km. 📍 Orange Line: → Sarakki Junction: 1.3 km → Kamakya–Ittamadu: 1.5 km → Kadabagere: 4 km 🛰️ Check your plot near the route before investing: bit.ly/4ArS008 #Bengaluru #NammaMetro #TalkingLands
This report has not been independently verified by Nesh.
