
Local UpdatesBengaluru1 min read
Bellandur Lake's rejuvenation faces a six-month delay as 70 acres of the lakebed near the eastern boundary still require desilting. Sign today at https://www.kybia.org
Added to Nesh: · Bengaluru · Local Updates
Source: X (@KYBIAOrg)
Shared on NeshSource: X (@KYBIAOrg)
Read originalBellandur Lake's rejuvenation faces a six-month delay as 70 acres of the lakebed near the eastern boundary still require desilting. #BellandurLake #Bengaluru #Kybia Sign today at kybia.org/petition 📝 to prevent further delay of desilting in Bellandur lake.
This report has not been independently verified by Nesh.
